Construction /research/taxonomy/term/1198/all en Foundation Repair around Redpath Hall & McTavish wing of the Redpath Library Building begins July 2nd /research/channels/news/foundation-repair-around-redpath-hall-mctavish-wing-redpath-library-building-begins-july-2nd-357813 <p><em>La version française suit.</em></p> <p>From the week of July 2nd through fall 2024, foundation repair will take place on Redpath Hall & the McTavish wing of Redpath Library Building</p> <p>The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Library, McTavish Wing, building envelope rehabilitation project.</p> <p><b>Construction start & end dates: </b></p> Wed, 26 Jun 2024 17:43:12 +0000 admin 5467 at /research Excavation work around Redpath Hall & McTavish wing of Redpath Library Building begins June 3 /research/channels/news/excavation-work-around-redpath-hall-mctavish-wing-redpath-library-building-begins-june-3-357507 <p><em>La version française suit.</em></p> <p>During the week of June 3, 2024, standard archeological and soil investigations will be conducted along McTavish Street around Redpath Hall and the McTavish Wing of the Redpath Library Building to assess the building envelope. Redpath Hall and the Redpath Library Building are part of a designated heritage site. Standard protocol requires that Æ»¹ûÒùÔº conduct excavation work before starting any construction projects.</p> <p>The exploratory investigations will be done in two phases:</p> Thu, 30 May 2024 22:10:36 +0000 admin 5411 at /research Exploratory work on Redpath Library Building, May 28-31 /research/channels/news/exploratory-work-redpath-library-building-may-28-31-357450 <p><i>La version française suit.</i></p> <p>Exploratory work will be carried out on the Redpath Library Building (McTavish side) from May 28 to May 31, 2024. The work will be related to upcoming foundation, windows, and roofing projects, and will be carried out in enclosures to control any dust, in accordance with Quebec CNESST regulations and cautionary asbestos conditions. There may be noise disruptions as a result.</p> <p>We encourage you to study in the McLennan Library Building or <a href="/library/branches">another Æ»¹ûÒùÔº library location</a> during this time.</p> Mon, 27 May 2024 18:39:34 +0000 admin 5395 at /research Passageway temporarily blocked from McTavish to the McLennan-Redpath Terrace for HVAC work April 22 /research/channels/news/passageway-temporarily-blocked-mctavish-mclennan-redpath-terrace-hvac-work-april-22-356884 <p>Please note that<b> </b>the exterior passageway between McTavish and the McLennan-Redpath Terrace will be blocked off for work on HVAC units on Monday, April 22.</p> <p>During this period, the McLennan-Redpath Complex will be open its usual <b><a href="/library/branches/hssl">hours</a></b>. For access to the Complex from McTavish, please enter further up the street, near Morrice Hall.</p> <p>We apologize for any inconvenience and thank you for your understanding.</p> Fri, 19 Apr 2024 16:31:24 +0000 admin 5291 at /research