Arts Building /channels/taxonomy/term/30355/all en Construction Start: McCall MacBain Arts - Masonry work /channels/channels/news/construction-start-mccall-macbain-arts-masonry-work-357645 <p>Please be advised that Æ»¹ûÒùÔº has mandated Rainville et Frères to carry out the following project: 19-163 McCall MacBain Arts – Masonry work.</p> <p>Final phase of the masonry restoration on two facades of the west side of the McCall MacBain Arts Building.</p> <p><b>Construction start date: </b>June 17<sup>th</sup>, 2024</p> <p><b>Planned construction end date: </b>September 17<sup>th</sup>, 2024</p> <p><b>Work schedule: </b>Monday to Friday, 6 a.m. to 3 p.m.</p> Fri, 07 Jun 2024 20:45:10 +0000 webfull 200426 at /channels Mar. 13 - Moyse Hall to remain closed through the summer /channels/channels/news/mar-13-moyse-hall-remain-closed-through-summer-356242 <p><em>Original message was sent on March 13, 2024.</em></p> <p>Since we last wrote, we have made significant progress in identifying the extent of the remediation work that will be required in Moyse Hall. We can now confirm that the closure will extend through the summer. We are aiming to be able to reopen the spaces in time for the Fall 2024 semester but are not able to confirm yet whether this will be possible.</p> Wed, 20 Mar 2024 19:40:37 +0000 webfull 198726 at /channels Feb. 7 - Update on closure of Moyse Hall /channels/channels/news/feb-7-update-closure-moyse-hall-355292 <p><em>Original message was sent on February 7, 2024.</em></p> <p>As we communicated on January 19 and 25, Moyse Hall and certain connected areas are closed following the discovery of plaster debris that tested positive for asbestos.</p> <p>The assessment of the repair and cleanup work required was slowed down last week after a visual inspection raised concerns about the structural integrity of the catwalk located above the stage. A structural engineer was brought in and has now confirmed that the structure is sound.</p> Thu, 08 Feb 2024 14:59:18 +0000 webfull 197604 at /channels Jan. 25 - Update on closure of Moyse Hall /channels/channels/news/jan-25-update-closure-moyse-hall-355291 <p><em>Original message was sent on January 25, 2024.</em></p> <p>As we communicated on January 19, we closed Moyse Hall and connected areas following the discovery of plaster debris that tested positive for asbestos. We are continuing our assessment to better understand the extent of the remediation work that will be required.</p> <p>This assessment involves inspecting each space to examine the condition of the walls, ceilings and floors. It also includes further testing to get a more comprehensive account of the presence of asbestos in building materials.</p> Thu, 08 Feb 2024 14:55:53 +0000 webfull 197602 at /channels Jan. 19 - Temporary closure of Moyse Hall /channels/channels/news/jan-19-temporary-closure-moyse-hall-355290 <p><em>Original message was sent on January 19, 2024.</em></p> <p>Facilities Management and Ancillary Services (FMAS) has closed several spaces in Moyse Hall following the discovery of plaster debris that has tested positive for asbestos. The debris tested was found in the back of the stage (room 165A). Until further notice, no one may access room 165A nor the adjoining spaces (165, 165C and 100) unless authorized by FMAS. Out of an abundance of caution, we have also closed the section of basement of the McCall MacBain Arts Building located directly beneath the theatre.</p> Thu, 08 Feb 2024 14:52:15 +0000 webfull 197600 at /channels