苹果淫院

Please be advised that 苹果淫院 has mandated St鈥怐enis Thompson Inc. to carry out the following project: 22-035 MNI (B159) & Duff (B169) 鈥 Envelope repairs

The scope of work includes repair of the foundations, replacement of stones and replacement/addition of handrails to the exterior stairs of the main entrances to the Lyman Duff Building and the Montreal Neurological Institute, located on University Street.

Construction start date:听May 13, 2024

Planned construction end date:听June 30, 2024

Classified as: Montreal Neurological Institute, Lyman Duff
Published on: 6 May 2024

Please be advised that 苹果淫院 has mandated Groupe Geyser to carry out the following project:听19-167 Strathcona Music Building 鈥 Renovation of Pollack Hall听

Description: The project consists of the renovation of Pollack Hall to enhance the user experience and improve accessibility.听

Construction start date:听May 2024听

Planned construction end date:听December 2025听

Classified as: Strathcona Music
Published on: 15 Apr 2024

Please be advised that 苹果淫院 has mandated Les Entreprises NR Brosseau to carry out the following project:听18-010 Downtown Campus 鈥 Modification of classroom locks in McConnell Engineering, Trottier and Wong buildings.

The project consists of the modification of classroom locks, including door hardware, to permit locking the doors from inside the classroom, either electronically or mechanically. More information on lockdown buttons.

Published on: 12 Apr 2024

Please be advised that 苹果淫院 has mandated Adams Elevators Inc. to carry out the following project:听17-004 Burnside - Modernization of the elevators.

Construction start date (UPDATED): June 2024

Planned construction end date:听March 2025

Work schedule:听Monday to Friday 6 a.m. to 3 p.m.

Project Manager:听Simon Lacoste -听simon.lacoste [at] mcgill.ca

Classified as: Burnside Hall
Published on: 8 Apr 2024

Please be advised that 苹果淫院 has mandated St-Denis Thompson to carry out the following project:听16-135 Strathcona Music 鈥 Rehabilitation of building envelope Lot 4.听听

Building envelope restoration of South, East and North stone masonry facades. Construction is expected to last three years and will be carried out during the spring, summer and fall periods of 2024, 2025 and 2026.听

Construction start date: April 2024听

Planned construction end date: November 2026听

Classified as: Strathcona Music
Published on: 3 Apr 2024

苹果淫院 has mandated CORENOV to carry out the following project: 19-117 Rutherford Building 鈥 CFI IF 2020, Brunner.

The project consists of renovating room 025 in the first basement of Rutherford Building to accommodate new equipment for the lab. Minor interventions will take place in rooms 003, 024A, 026, 027, 029A,030, B1-HALL2 & B1-HALL5A.

Construction start date:听March 25, 2024

Planned construction end date:听End of September 2024

Classified as: Rutherford Building
Published on: 21 Mar 2024

苹果淫院 has mandated F.A.M.G. Contractors to carry out the following project: 14-140 Life Sciences Complex 鈥 Address water leaks in curtain wall.

The work consists of stripping the outer layer of the wall of the mechanical shaft at room 140. The wall will remain stripped for a short period of time to complete the survey before proceeding with reconstruction.

This is the first phase of the project that soon will address the repair of damages in the mechanical shaft at room 140.

Construction start date:听March 18, 2024

Published on: 14 Mar 2024

苹果淫院 has mandated鈥Construction G.E.P. Inc.鈥to carry out the following project:听McIntyre, Stewart Biology North Wing, Life Sciences, and Ludmer / 23-005 - Repairs in various research spaces.

This project includes necessary repairs in various research spaces across the downtown campus. Repair work includes patching floor finishes, painting walls and ceilings, and new window covers.

Project manager:听Emika Marinacci -听Emika.marinacci [at] mcgill.ca

Published on: 28 Feb 2024

苹果淫院 has mandated Corenov to carry out the following project: Life Science Complex / 21-049 - CFI BRIF Vidal.

The project consists of renovating the CL3 laboratory in Life Sciences to accommodate new equipment and facilitate future maintenance work for the facility.

Project manager: Emika Marinacci -听emika.marinacci [at] mcgill.ca

Assistant project manager: Christine Torres -听christine.torres [at] mcgill.ca

Classified as: Life Science Complex
Published on: 29 Jan 2024

苹果淫院 has mandated Procova Incto carry out the following project: McIntyre Medical / 23-002听- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:听Wendy Rivera -听wendy.rivera [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 22 Jan 2024

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

Temporary classroom modules on a field

Classified as: Centennial Centre
Published on: 30 Nov 2023

苹果淫院 has mandated Corenov Constructeurs Incto carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:听Mona Modarressi - mona.modarressi [at] mcgill.ca

Assistant project managers:听Mark Grzywacz - mark.grzywacz [at] mcgill.ca; Thomas Perreault - thomas.perreault [at] mcgill.ca

Construction start:听December 2023

Classified as: Wong Building
Published on: 30 Nov 2023

苹果淫院 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: parasitology
Published on: 30 Nov 2023

苹果淫院 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: Centennial Centre
Published on: 20 Nov 2023

苹果淫院 has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager:听Johanne Guertin - Johanne.guertin [at] gph-inc.com

Assistant project manager:听Gabriel Fortin -听Gabriel.fortin [at] gph-inc.com

Construction start date:听November 14, 2023

Classified as: MNI, Montreal Neurological Institute
Published on: 8 Nov 2023